MFJ 7. august 2003
|
Dina regnskab for 2002 FORDELING PÅ AKTIVITETER (UNIT: 1000 DKR ) |
||||
|
Activity |
Budget type *) |
Originalt Budget |
Totalt Forbrug |
Beskrivelse |
|
Network |
||||
|
Head |
A |
25 |
25 |
Dispositionsbeløb til aflastning mv. af MFJ |
|
Deputy head |
A |
10 |
10 |
Dispositionsbeløb til aflastning mv. af ITH |
|
Annual meeting |
B |
25 |
35 |
Skønnede faktiske driftsomkostninger afholdt af DJF 25 KKR. Dispositionsbeløb til aflastning mv. af NT 10 KKR |
|
10 IT Coordinators, basic allowance 5 |
A |
55 |
40 |
ML, NT, ALJ, MSL, JPH, EJN, GB, HC. Alle Dispositionsbeløb til aflastning mv. 5 KKR. |
|
IT Coordinators, special allowance (10 per workshop per coordinator) |
A |
80 |
40 |
Dispositionsbeløb til aflastning mv. i forbindelse med afholdelse af workshop: ALJ: 10 KKR, MSL: 10 KKR, GB: 10 KKR, HC: 10KKR |
|
IT workshops |
B |
40 |
35 |
Bioinf. og Kv. Genetik : 2 workshops: Udgifter skønnet 25 KKR (Risø) Beslutningsstøtte 1 workshop skønnet 10 KKR (DJF) |
|
Secretariat (KVL) and Webmaster |
A / B |
100 |
100 |
75 IMF, 25 KKR betalt fra Skejby |
|
General costs |
B |
25 |
25 |
IMF |
|
Total Network |
A/B |
360 |
310 |
|
|
Research School |
|
|
||
|
Head |
A |
200 |
200 |
Dispositionsbeløb til aflastning mv. ARK: 80 KKR, EJ: 120 KKR |
|
3 Experts, basic allowance 30 |
A |
90 |
90 |
Dispositionsbeløb til aflastning mv. PS: 30 KKR, RWp: 30 KKR, PGT: 30 KKR |
|
Experts, special allowance 25 per summer school, 5 per workshop |
A |
15 |
10 |
Dispositionsbeløb til aflastning mv. Rwp: 5 KKR , PS: 5 KKR |
|
2 Workshops |
B |
60 |
40 |
Dispositionsbeløb til aflastning mv. Søren Lundby: 5 KKR, AP: 5 KKR, Drift: WS 1 - DJF : 30 KKR , WS 2: 0 (Betalt af NorFA) |
|
1 Summer school (funded by NOVA- NorFA) |
B |
0 |
0 |
0 |
|
PhD course Foulum |
A |
50 |
0 |
Disse kurser er først fra 2003 integrerede i Dina |
|
General costs |
B |
5 |
5 |
IHH |
|
PhD scholarships |
B |
0 |
0 |
|
|
Total Research School |
A/B |
420 |
345 |
|
|
Total |
A/B |
780 |
|
|
|
Member contribution |
|
750 |
750 |
|
|
Transfer from 2001 |
|
69 |
69 |
|
|
Result |
|
39 |
164 |
|
*) A: Fixed amount. Each institution disposes of the money as long as the work is done.
*) B: Estimated cost. The final amount should be accounted for.